Creative, Timely Solutions Lead to Successful Dam Repair in Medford Lakes

By Kevin Yezdimer, P.E. and Jim Hunt, P.E.

Just 25 miles east of Philadelphia, on the edge of the New Jersey Pinelands region, sits a network of 22 lakes that serve a multitude of recreation purposes for the residents of Medford Lakes. Serving as the guardian to these natural beauties is the Medford Lakes Colony (MLC), a private homeowner association. Homeowners in this community contribute to a “Lake Restoration Fund,” managed by MLC, which is used to maintain the water control structures and monitor the water quality for the bodies of water within the community. This dedicated fund is often used for dredging of the lake beds; repairs and replacement of dams, spillways, and culverts; installation of aerators or fountains to promote long-term benefits to water quality; treatments for weeds and algae; and the maintenance of the coves and beaches.

In mid-April, a concerning blockage developed in Lake Wauwauskashe Dam’s spillway and water was backing up at the upstream outlet structure. The 30-inch wide corrugated metal pipe serves as the dam’s primary (and only) outlet under Wagush Trail, a neighborhood road connecting Lake Wauwauskashe and Lake Mushkodasa. During the attempt to clear the mass of accumulated woody-debris via vacuum truck extraction, a previous repair consisting of a 5’ segment of corrugated plastic pipe had been dislodged and expelled from the downstream end of the spillway. With a compromised dam and flooding in the forecast, MLC acted immediately to handle this emergency dam repair.

Primary Spillway Inlet
Before – Upper portion of the existing corrugated metal pipe was collapsed. After – Pipe was slip-lined and the annulary space was grouted.

 

Given Princeton Hydro’s long-term history of inspecting and maintaining dams and levees in Medford Lakes, MLC contracted our experts to assist. The next day, our team of geotechnical engineers were on-site to investigate the situation. To facilitate the inspection and minimize the stress/pressure on the dam, the upstream and downstream lakes were lowered via an NJDEP Fish and Wildlife Lake Lowering Permit. Additionally, a video inspection of the compromised culvert pipe was conducted. Our geotechnical team observed that the upstream portion of the pipe had collapsed and the structure was experiencing significant seepage (i.e. water flowing through undesirable paths through the dam with the potential for soil piping and stability failure).

Primary Spillway outlet
Before – The existing corrugated metal pipe had corroded and erosion had taken place around the outlet. After – Pipe has been slip-lined and outlet protection (riprap) was installed to stabilize the surrounding soil.

 

With the risk of potential dam failure, Princeton Hydro immediately kicked-off coordination with the NJDEP Bureau of Dam Safety, NJDEP Division of Land Use Regulation, the Pinelands Commission, and the Borough of Medford Lakes. Our licensed engineers promptly developed the repair concept and associated scope of work, detailing our proposed means and methods for the emergency repair.

“We take the potential risk of dam failure very seriously, as safety is one of our core values,” said Kevin Yezdimer, P.E. Director of Geosciences Engineering at Princeton Hydro. “Our geotechnical team prioritized the design, permitting, and implementation of this emergency repair to assure the safety of our client and the community.”

Injection grouting underway (Grout pressure is monitored during placement & the ground surface is monitored for signs of heave).

This included addressing the collapsed pipe; utilizing cementitious injection grouting and compaction grouting to eliminate seepage pathways and stabilize the earthen dam in-place; and provide spillway outfall protection. Through private solicitation, Princeton Hydro selected Compaction Grouting Services, Inc. as the specialty contractor to perform the repair.

A considerable volume of water was required to prepare the grout mixes, and no water sources were available adjacent to the project site. Seeking out solutions, MLC proposed the unique idea of using reclaimed wastewater from the local wastewater treatment plant. Our team confirmed that reuse of the reclaimed wastewater was indeed within the guidelines of the “Technical  Manual for Reclaimed Water for Beneficial Reuse,” and we successfully facilitated approval to use it with NJDEP Division of Water Quality.

Placement of cellular fill into the hollow concrete structure is underway. A lightweight foaming agent was added to the grout mix within the concrete truck. The lightweight grout was then pumped into the structure.

As the construction effort ramped-up, some complications arose. By design, this unique structure allows water flow over the dam’s weirs and drops 8 to 10 feet vertically before travelling under the roadway through the primary spillway. Above the primary spillway is a concrete structure that spans from the upstream lake to the downstream lake and immediately beneath the local roadway. It was discovered that this 50’ long, 6’ deep, concrete structure was hollow and served as a potential seepage pathway. Princeton Hydro proposed to fill-in the hollow structure with a lightweight cellular fill material in order to cut-off the potential seepage pathways, eliminate the 6’ deep hollow chamber beneath the roadway, and facilitate a long-term repair solution.

Implementation of this strategy was further complicated when a utility markout and a subsequent video inspection of the hollow structure confirmed that a gas line passed through the structure on the downstream side of the roadway. Princeton Hydro coordinated with South Jersey Gas to disconnect the gas line in order to minimize risk during construction and eliminate future complications. The neighborhoods on either side of the dam were fed redundantly, so their service was not interrupted during this process.

Overall, the emergency dam repair solution involved an in-situ soil stabilization of an earthen embankment dam via compaction/injection grouting, slip-lining the primary spillway, stabilization of the downstream outlet, and utilization of reclaimed wastewater as a water source for on-site grout batching. The following was completed by our team and contractors during the course of the emergency construction:

  • Slip-lining of the failed 30-inch pipe using a smooth, slightly smaller in diameter high density polyethylene pipe (HDPE) pipe inside of the existing pipe, providing an equal or greater hydraulic capacity as that existing;

  • Grouting of the annular space between the new and old pipes;

  • Non-woven geotextile fabric and riprap outfall protection were placed around the downstream outlet of the culvert pipe to provide scour protection;

  • Compaction and injection grouting was performed in multiple locations. The compaction grout utilized a “low-slump” mix while the injection grout utilized a much more mobile or fluid mix allowing for filling of existing seepage pathways or soil voids, and;

  • Approximately 44 cubic yards of lightweight cellular-grout backfill was utilized to fill in the hollow concrete structure beneath the roadway completing the emergency repair without the need for complete outlet structure or earthen dam reconstruction.

Lowering New Pipe Into Place

Creative, innovative solutions paired with timely coordination and expertise drove the success of the Lake Wauwauskashe Dam emergency repair.

Princeton Hydro has designed, permitted, and overseen the reconstruction, repair, and removal of a dozens of small and large dams in the Northeast. To learn more about our dam and barrier engineering services, visit: bit.ly/DamBarrier.

Kevin M. Yezdimer, P.E., Princeton Hydro’s Geoscience Engineering Director, is a multidisciplinary professional civil engineer who holds degrees in both Geology and Civil Engineering, and has 11 years of progressive and varied work experience as both a design consultant and project owner with Geotechnical & Construction Engineering being his core area of expertise. He has significant experience performing soil and rock core sampling programs, infiltration testing, soils laboratory testing, foundation design (shallow and deep), preparation of construction recommendations,  and overseeing construction review activities (e.g., earthwork, foundations, concrete, masonry, structural steel, roadway, and utility construction).

 

Jim Hunt, P.E., joined Princeton Hydro in 2017 as a Geotechnical Engineer and provides a wide range of engineering services for the firm including: subsurface explorations, bearing capacity and settlement analyses, slope stability analysis, stability analysis of existing structures, preparation of technical deliverables, and cost estimating.

 

 

 

Wild & Scenic Film Festival is Coming to Hackettstown

To celebrate the 50th Anniversary of the Wild and Scenic Rivers Act, the Musconetcong Watershed Association (MWA) is hosting the “Wild & Scenic Film Festival On Tour”. The festival is free and open to the public, but seating is limited so, registration is required. The festival will be held on Sunday, September 9th from 10 am to 2 pm at Centenary University in Hackettstown, NJ.

To bring communities together around local and global environmental issues, The “Wild & Scenic Film Festival” goes “on-tour” partnering with nonprofit organizations and local groups to screen films year-round with hopes of inspiring individuals to take environmental action. The tour stops in 170 communities around the globe, features over 150 award-winning films, and welcomes over 100 guest speakers, celebrities, and activists who bring a human face to the environmental movement.

Credit: NPS.gov

The Hackettstown, NJ tour event will feature 11 short films including River Connections, which celebrates the 50th anniversary of the Federal Wild and Scenic Rivers Act, under which the Musconetcong River is protected. The film explores the importance of free-flowing rivers and highlights the recent Hughesville Dam removal project. An interactive panel event will follow the film screening and feature experts including MWA Executive Director Alan Hunt, Ph.D. and Princeton Hydro President Geoffrey Goll, P.E., who were both interviewed in the film.

“Our multidisciplinary approach to dam removal using ecology and engineering, paired with a dynamic stakeholder partnership, led to a successful river restoration, where native fish populations returned within a year,” said Princeton Hydro’s President Geoffrey Goll, P.E. “We are grateful for MWA’s hard work in organizing this film festival so we can continue to share our dam removal success stories and the importance of the Wild and Scenic Rivers Act.”

Princeton Hydro, a proud sponsor of the “Wild & Scenic Film Festival On Tour,” has worked with MWA to design five dam removals on the Musconetcong River, including the Hughesville Dam. As noted in the River Connections film, the Hughesville Dam was a major milestone in restoring migratory fish passage along the Musconetcong. Only a year after the completion of the dam removal, American shad were documented as having returned to the “Musky” for the first time in 250 years.

The tour leads up to the annual 5-day film festival, which will be held January 17-21, 2019 in Nevada City and Grass Valley, California. Sponsored by National Park Service, the Wild & Scenic Film Festival honors the Wild and Scenic Rivers Act, landmark legislation passed by Congress in October 1968 that safeguards the free-flowing character of rivers by precluding them from being dammed, while allowing the public to enjoy them. It encourages river management and promotes public participation in protecting streams.

EVENT DETAILS:

Date:         Sunday, September 9th

Time:         Doors open at 10 am and shows start at 11 am

Location:  Centenary University, Sitnik Theatre,
                  400 Jefferson St, Hackettstown, NJ 07840

Tickets:     FREE! Please register in advance:
                   https://goo.gl/NrwcgE

 

Interested to learn more about River Connections?
Check out our blog celebrating the release of the film: 

WINNER! #LakesAppreciation Month Contest Results

Princeton Hydro’s #LakesAppreciation Month contest is officially closed, and we’re excited to announce Holden Sparacino as the winner! Holden, a Graduate Research Assistant at University of Vermont, has won a one-year membership to the North American Lake Management Association (NALMS) and a $100 Amazon gift card.

The Lakes Appreciation Month contest encouraged people who enjoy lakes to participate in a “Secchi Dip-In,” which is an annual citizen science event created by NALMS in 1994 in order to involve lake-goers and associations across North America in monitoring water quality by using a Secchi disk to monitor the transparency or turbidity of their local waterway.

Thanks so much to everyone who participated in the contest and showed your appreciation for lakes!

Read more about the Secchi Dip-in Contest here:

CONTEST ALERT: Celebrate #LakesAppreciation Month and Win $100

 

Restoring and Revitalizing Freshwater Mussels

Freshwater mussels are among the oldest living and second most diverse organisms on Earth with over 1,000 recognized species. Here in the eastern part of the U.S., we have more species of freshwater mussels than anywhere in the world. Unfortunately, freshwater mussels are one of the most rapidly declining animal groups in North America. Out of the 300 species and subspecies found on the continent, 70 (23%) have been federally listed as “Threatened” or “Endangered” under the Endangered Species Act. And, in the last century, over 30 species have become permanently extinct. So, why are populations declining so fast?

Freshwater mussels are filter feeders and process large volumes of the water they live in to obtain food. This means of survival also makes them highly susceptible to industrial and agricultural water pollution.  Because they are constantly filtering water, the contaminants and pathogens that are present are absorbed into the mussel’s tissues. As such, mussels are good indicators of water quality and can greatly contribute to improving water quality by filtering algae, bacteria and organic matter from the water column.

Not only do freshwater mussels rely on water quality, they are dependent on fish and other aquatic organisms for reproductive success. In order for a freshwater mussel to complete the reproduction process, it must “infect” a host fish with its larvae. The method depends on the specie of mussel. Some species lure fish using highly modified and evolved appendages that mimic prey. When a fish goes into investigate the lures, the female mussel releases fertilized eggs that attach to the fish, becoming temporarily parasitic. Once the host fish is infected, it can transfer the mussel larvae upstream and into new areas of the river.

Both habitat loss from dam construction and the introduction of pesticides into the water supply has contributed to the decline of freshwater mussels. With approximately 300 mussel species in the U.S. alone, a critical component of restoring and revitalizing mussel populations is truly understanding their biology, which begins with the ability to properly differentiate each species and properly identify and catalog them. Princeton Hydro’s Senior Scientist Evan Kwityn, CLP and Aquatic Ecologist Jesse Smith recently completed the U.S. Fish and Wildlife Service‘s Fresh Water Mussel Identification Training at the National Conservation Training Center in West Virginia.

Through hands-on laboratory training, Evan and Jesse developed their freshwater mussel identification skills and their knowledge of freshwater mussel species biology. Course participants were tasked with mastering approximately 100 of the most common freshwater mussel species in the United States. They also learned about proper freshwater mussel collection labeling, the internal and external anatomy and meristics of a freshwater mussel, and distributional maps as an aid to freshwater mussel identification.

In a recently published press release, Tierra Curry, a senior scientist with the Center for Biological Diversity was quoted as saying, “The health of freshwater mussels directly reflects river health, so protecting the places where these mussels live will help all of us who rely on clean water. This is especially important now, when we see growing threats to clean water from climate change, agriculture and other sources.”

Princeton Hydro is committed to protecting water quality, restoring habitats, and managing natural resources. Read about some of our recent projects and contact us to discuss how we can help you.

To learn more about freshwater mussels, check out this video from U.S. Fish and Wildlife Service:

UPDATE: The Columbia Dam Is Coming Down

It’s happening! The Columbia Dam on the Paulins Kill in Northern New Jersey is finally coming down thanks to a successful collaboration between The Nature Conservancy, American Rivers, U.S. Fish and Wildlife Service, NJDEP Division of Fish and Wildlife Service, and Princeton Hydro. The first cut on the main dam wall was made just two weeks ago, and the water has started flowing downstream as the concrete is slowly being removed by the contractors RiverLogic Solutions and SumCo Eco-Contracting.

“In New Jersey, successful dam removal projects are often the result of partnerships between nonprofit organizations, federal and state agencies, consultants, and others working together toward the common goal of river restoration,” exclaimed Dr. Laura Craig, Director of River Restoration, American Rivers. “The first day of dam demolition is always a joyous occasion for project partners, but I was especially happy to see the river flowing through the breached Columbia Dam for the first time after working so intensely on this project for the last few years.”

Princeton Hydro has been involved with the engineering and restoration design from the beginning, so we’re very excited to report on this major update.  Our team of engineers and ecologists studied the feasibility of removal as requested by American Rivers in partnership with the New Jersey chapter of The Nature Conservancy.  We investigated, designed, and prepared the necessary permits for the removal of this dam. And, now we’ve been subsequently been hired to provide construction administration services during the removal process, which means we get to see the dam come down firsthand, piece by piece!

“It is truly amazing and exciting to finally see the main and remnant dams come down, as I have been involved in this restoration effort since the feasibility stage,” said Kelly Klein, Senior Project Manager, Princeton Hydro. “I am so honored to be part of this dynamic team and to collaborate with our project partners during every stage of this dam removal.”

Geoff Goll, Princeton Hydro and Beth Styler Barry, The Nature Conservancy on site August 3, 2018. Photo credit: Laura Craig, American Rivers

“On Friday, August 3rd 2018, we began demolition of the 300 foot-long, 18 foot-high Columbia Dam. The Paulins Kill will run freely to meet the Delaware River for the first time in 109 years,” said New Jersey Nature Conservancy’s Beth Styler Barry. “The benefits of reconnecting these two freshwater ecosystems will be immediate and impact creatures that live in and near the stream, as well as people who come out to paddle, fish or enjoy the wildlife. Dam Removal projects are exciting, ecologically important and also a challenge, this project is a good example of partners coming together to get a great restoration project done.”

Because this is a big deal, we want to keep *YOU* updated on what’s happening from the field. Moving forward, we’ll post weekly blogs with scenes from the site.  Here’s a snapshot of what’s been happening over the last last two weeks:

August 1, 2018. Photo credit: Casey Schrading, Princeton Hydro

In order to make the first saw cut into the dam, Princeton Hydro and RiverLogic Solutions first identified the locations of the drill holes. These drill holes are used to feed the diamond wire through the dam for saw cutting.

August 1, 2018. Photo credit: Casey Schrading, Princeton Hydro

The crew placed the saw cutter machine on the staging area on top of the apron and prepared for the cut.

August 3, 2018. Photo credit: Princeton Hydro

In order to create a notch in the dam, the crew supplemented the saw cutting with hammering.

August 3, 2018. Photo Credit: The Nature Conservancy, Columbia Dam Volunteer Drone Team

August 3, 2018. Photo credit: Erik Sildorff, Delaware Riverkeeper Network

August 7, 2018. Photo credit: Casey Schrading, Princeton Hydro

Since the high water level was now higher than the bottom of the breach, water is able to flow in and over the notched section.

August 14, 2018. Photo credit: RiverLogic Solutions

Because of high flows of water from recent storm events, the dam breach is being widened to allow for larger flows of water to move downstream during high flow events. 

Additionally, a few weeks ago we reported on the lowering of the water levels and removal of the remnant dam downstream (below).

PHOTOS: Columbia Dam Removal

Since then, the remnant dam has been completed removed and the area has been stabilized.

July 23, 2018. Photo credit: Casey Schrading, Princeton Hydro

Now, the water can freely flow through this section of the Paulins Kill.

And, in case you missed it, we celebrated the commencement of the Columbia Dam removal with NJDEP’s Commissioner Catherine McCabe and our project partners. Full story below:

Celebrating the Columbia Dam Removal

Princeton Hydro has designed, permitted, and overseen the reconstruction, repair, and removal of a dozens of small and large dams in the Northeast. To learn more about our fish passage and dam removal engineering services, visitbit.ly/DamBarrier.

Lithuania Hosts First-ever Dam Removal Workshop Feat. Princeton Hydro Expert

Lithuania Hosts its First-Ever
Dam Removal Workshop

Princeton Hydro’s Laura Wildman Invited to Present

History was recently made in Lithuania with the occurrence of the first-ever dam removal workshop held in the country. Experts throughout the world convened at the Ministry of Environment in Vilnius, the capital of Lithuania, to lead discussions on a variety of topics related to dam removal and river rehabilitation.  They covered the current state of affairs regarding Lithuanian dams and showcased the Dam Removal Europe (DRE) initiative, a new effort aimed at restoring rivers in Europe.

The workshop was the brainchild of Lithuanian environmental activist Karolina Gurjazkaitė. She read about the DRE campaign and was so inspired by the initiative, she contacted DRE representatives about organizing the workshop. Her goals in organizing the first-ever dam removal workshop in Lithuania were to build awareness around the importance of river restoration, call attention to the many outdated, unmaintained, and unnecessary dams throughout Lithuania, and ultimately inspire positive changes in the way of dam removals and river rehabilitation.

“I am very excited, not only about the workshop, but also about the ‘side effects’…already created,” said Karolina. “People are gaining hopes and enthusiasm… This workshop may have really powerful outcomes!”

Karolina gathered a diverse group of workshop attendees, comprised of government officials (including the Vice-Minister of Environment of Lithuania), university professors (primarily specializing in dam safety and hydropower development), local environmental advocates and NGO volunteers, researchers, and students.

Presenters during the workshop included scientists, engineers, communication experts, planners, activists, and Princeton Hydro’s New England Regional Office Director and Fisheries Engineer Laura Wildman, P.E.

Presentations covered a wide variety of topics, including:

  • Policy and current situation in Europe: Pao Fernández Garrido of World Fish Migration Foundation, Spain presented on DRE findings related to policy and the current dam removal situation in Europe.

  • Research: Rachel Bowes from Karlstad University, Sweden spoke about current state of affairs with Swedish dam removal efforts and the research they are currently carrying out.

  • Book presentation: Herman Wanningen of World Fish Migration Foundation, Netherlands presented the new book, From Sea to Source 2.0, which is focused on tackling the challenges of restoring fish migration in rivers around the world and is available for free download.

  • Technical issues: Laura Wildman, PE, who has over 20 years of experience on dam removal, presented on the most important technical aspects when carrying out a barrier demolition.

On day two of the workshop, participants were invited to take part in field visits to five dam sites. Each of the five dams all presented their own unique challenges in terms of the ability to remove them. The site visits provided a deeper look into the challenges that will need to be addressed when forging ahead with a Lithuanian river restoration initiative.

The workshop proved to be instrumental in identifying key challenges and next steps in building a successful country-wide river rehabilitation initiative. One of the key takeaways from the workshop is the need for a more robust understanding of Lithuanian-specific rules and regulations that classify a dam removal project as either viable or not viable.

“Not only has there never been a dam removal workshop held in Lithuania, to date, a dam removal has never been completed in Lithuania, at least none that have been documented and none for environmental restoration reasons,” said Laura. “It’s clear that we still have a lot to explore and discover, but I am so thrilled to have been a part of this workshop. It was a very positive first step in the right direction, and I’m looking forward to watching and helping this initiative flourish.”

To learn more about Princeton Hydro’s dam removal and river restoration initiatives, go here.

 

Teaching NYC High Schoolers About Wetlands

Ms. Hannah Goldstein and her Environmental Science students at Franklin Delano Roosevelt High School in Brooklyn, NY welcomed Emily Bjorhus, Princeton Hydro Environmental Scientist, to be a guest speaker on the topic of wetlands. The students, 10th, 11th, and 12th graders, learned what defines a wetland, how wetlands function, and why wetland ecosystems are important to our communities. Emily also taught the students how to identify wetlands in the field.

The presentation also involved hands-on instruction, which included a trip outside to the school courtyard where students learned how to collect soil samples using an auger and how to determine if hydric soils are present. To identify surrounding trees, students used a dichotomous key, a tool that allows users to make a series of choices based on characteristics such as leaf and fruit shape. Using the skills and information they learned, Emily helped each classroom determine whether a wetland was present. As it turns out, the courtyard in the middle of Franklin Delano Roosevelt High School does not contain a wetland!

“Science is such an important subject matter for kids to be learning for a variety of reasons. Environmental science education in particular encourages thought patterns, which get kids engaged in real-world environmental protection activities,”  said Emily. “I really enjoyed working with Ms. Goldstein and her students. I hope my presentation inspires the students to learn more about wetlands and become ambassadors of wetland conservation.”

To learn more about Princeton Hydro’s tidal and freshwater wetland services, visit: bit.ly/PHwetland