Bloomfield: Restoration Efforts Transforming Industrial Site Into Thriving Public Park

A densely developed, flood-prone, former industrial site in Bloomfield, New Jersey is being transformed into a thriving public park and 4.2 acres of wetlands. This is thanks to the Third River Floodplain Wetland Enhancement Project, which broke ground in March of 2019. The project will restore valuable ecological functions and natural floodplain connection, enhance aquatic and wildlife habitat, and increase flood storage capacity for urban stormwater runoff.

The project team has already made tremendous progress at the site, which is located along the Third River and Spring Brook, two freshwater tributaries of the Passaic River. Princeton Hydro is serving as the ecological engineer to Bloomfield Township; our scientists and engineers have assisted in obtaining grants, collected background ecological data through field sampling and surveying, created a water budget, completed all necessary permitting, designed both the conceptual and final restoration plans, and continues to conduct construction oversight during the implementation of this important urban wetland creation project.

The project team recently utilized a drone to document the significant progress being made:

View of the construction progress with the proposed wetland to the upper half of the photo. Photo provided by Creamer Environmental.

 

View of the construction progress with the proposed wetland to the upper half of the photo. Photo provided by Creamer Environmental.

View of the construction progress with the proposed wetland to the upper half of the photo. Photo provided by Creamer Environmental.

Close-up view of the wetland construction progress. Note the hummocks and hollows created with the wetland soil as well as the habitat features constructed of trees and natural rock uncovered during the excavation process. Photo provided by Creamer Environmental.

Close-up view of the wetland construction progress. Note: the hummocks and hollows created with the wetland soil as well as the habitat features constructed of trees and natural rock uncovered during the excavation process. Photo provided by Creamer Environmental.

Nearly complete grading of the proposed wetland. Note the hummocks and hollows created with the wetland soil. Photo provided by Creamer Environmental.

Nearly complete grading of the proposed wetland. Note: the hummocks and hollows created with the wetland soil. Photo provided by Creamer Environmental.

Over 500 trees and shrubs have been planted in the new wetland with additional trees and shrubs planted along Lion Gate Drive and in existing woodlands. The selected native plant species all provide important wildlife value, including providing food and shelter for migratory birds. Enviroscapes was contracted to install all of the trees and wetland plants at this site and has nearly finished planting efforts:

Removing invasive species and replacing them with native plants, shrubs and trees sets the stage for a flourishing native plant community year after year.

Removing invasive species and replacing them with native plants, shrubs and trees, sets the stage for a flourishing wetland habitat.

The project is progressing quickly as the weather warms. Nearly all of the plantings have been installed and seeding is happening in the next two weeks.

This green infrastructure project will re-establish the natural floodplain wetland and riparian plant communities.

This green infrastructure project will re-establish the natural floodplain wetland and riparian plant communities.

We’re excited to see what the restoration will look like when it’s all finished. Check out additional photos below and stay tuned for project updates!

To learn more, check out the full story below:

Urban Wetland Restoration to Yield Flood Protection for Bloomfield Residents

Leave a Reply